North and South Atlantic Blue Shark MSE
(Prionace glaucas)

Generated by ChatGPT on 15 Feb 2026
Overview
While a formal MSE process has not yet been launched for Atlantic blue shark, the Commission has requested that the SCRS shall inform the Commission, by 2025, on the feasibility for developing an MSE framework for the management of North Atlantic (Rec. 23-10) and South Atlantic (Rec. 23-11) blue shark. In 2025 the SCRS recommended that the three-year option, with some preliminary work developed during 2026, and the core MSE work conducted in the 2027-2029 period, noting that efficiency can be gained by implementing a joint approach for both stocks (Anon., 2025).
| OMs development plan in 2026-2029 | MP adoption plan in 2029 | ECP adoption plan in 2029 |
![]() |
![]() |
![]() |
| Recondition not planned | MP not defined | ECs evaluation not started |
History
While a formal MSE process has not yet been launched for Atlantic blue shark, the Commission has requested that the SCRS provide, if possible, options of Harvest Control Rules (HCRs) with the associated reference points for blue shark in 2019 (Rec. 19-07; Rec. 19-08). The Commission reiterated that the SCRS shall inform the Commission, by 2025 on the feasibility, cost, options and tentative roadmap for developing an MSE framework for the management of North Atlantic (Rec. 23-10) and South Atlantic (Rec. 23-11) blue shark.
The SCRS has advanced MSE work for the blue shark stocks through two technical documents in 2024 and a feasibility analysis document in 2025. Taylor (2024) and Carruthers (2024) focus on developing code architecture, conducting preliminary closed-loop simulations for the northern stock, and assessing technical feasibility. Based on these studies, Taylor et al. (2025) presented a feasibility study by examining two implementation options: a two-year process with Management Procedure (MP) adoption by 2027, and a three-year process with adoption by 2028.
In 2025, the SCRS recommended that the three-year option, with some preliminary work developed during 2026, and the core MSE work conducted in the 2027-2029 period (i.e. the three-year option beginning in 2027), noting that efficiency can be gained by implementing a joint approach for both stocks.
Operating Models (OMs)
Although a formal MSE process has not yet been launched for Atlantic blue shark, some closed-loop simulation MSE works (Taylor 2024; Carruthers 2024) have been conducted based on the previous stock assessments (Anon., 2015; Anon., 2023). These preliminary works included the evaluations of Candidate Management Procedures (CMPs) against minimum performance standards.
Management Objectives
Management Objectives have not yet been established.
Candidate Management Procedures (CMPs)
The SCRS plans to develop various CMPs in 2026-2029.
Management Procedure (MP)
The SCRS plans that the Commission will adopt an MP by 2029.
Exceptional Circumstances (ECs)
The SCRS plans to develop a draft of the Exceptional Circumstances Protocol (ECP) in 2029.
References of Atlantic blue shark


